Hersham and Walton-on-Thames Roadworks Starting This Week!

roadworks-400

Local Roadworks Starting This Week!

This week’s digest of roadworks likely to cause delays in Hersham, Walton-on-Thames, Esher, Cobham and Weybridge as well as the A3 and M25 over the course of the next 7 days.

This week featuring: Walton Bridge Road, Brooklands Road, Oatlands Drive and Portsmouth Road!

________________________________________

Brooklands Road, Weybridge

22 January — 22 January
Delays likely Traffic control (multi-way signals)
Works location:Junction With St Georges Avenue. C\W.
Works description:2 X Traffic Lights Heads Only
Responsibility for works:UK Power Networks
Current status: Advanced planning

________________________________________

Hampton Court Way, Esher, Surrey

22 January — 22 January
Delays likely Traffic control (two-way signals)
Works location: Bridge (Rail Over Road) No: 2/54…
Works description: Detailed Bridge Examination Between The Hours Of 09:30 And 15:00…
Responsibility for works: Network Rail Infrastructure Ltd
Current status: Advanced planning

________________________________________

Oatlands Drive, Weybridge, Surrey

23 January — 27 January
Delays likely Traffic control (priority working)
Works location: O/S 5
Works description: Lay New Service 4 Mtrs From N/Side C/Way To Continue A Further 2 Mtrs In Private To Property…
Responsibility for works: SGN
Current status: Advanced planning

________________________________________

Portsmouth Road, Thames Ditton, Surrey

24 January — 26 January
Delays likely Traffic control (two-way signals)
Works location: Windy Ridge
Works description: Service Pipe Repair
Responsibility for works: Thames Water
Current status: Advanced planning

________________________________________

Walton Bridge Road, Shepperton, Surrey

20 January — 21 January
Delays likely Traffic control (multi-way signals)
Works location: From Outside Walton Bridge Garage To The Start Of The Eastern Exit Arm Of The Roundabout…
Works description: Replacement Of Failed Carriageway Surfacing And Application Of Road Markings…
Responsibility for works: Surrey County Council
Current status: Advanced planning
________________________________________

B376 Laleham Road, Shepperton, Surrey

23 January — 25 February
Delays possible Traffic control (multi-way signals)
Works location: J/W Acacia Avenue To J/W Sheepwalk…
Works description: Footway Recon Works
Responsibility for works: Surrey County Council
Current status: Advanced planning

________________________________________

Cobbetts Hill, Weybridge, Surrey

22 January — 22 January
Delays possible Traffic control (multi-way signals)
Works location: Junction With Brooklands Road . C\W….
Works description: Connections Small Service:New Service: (Approx Depth 450mm-600mm):Traffic Light Head Only…
Responsibility for works: UK Power Networks
Current status: Advanced planning

________________________________________

Herons Croft, Weybridge, Surrey

23 January — 03 February
Delays possible Traffic control (multi-way signals)
Works location: At The Junction With Old Avenue – Fw Cw…
Works description: Gas Main Replacement. To Complete Mains Connections. Complete Reinstatement….
Responsibility for works: SGN
Current status: Advanced planning

________________________________________

More Lane, Esher, Surrey

23 January — 01 February
Delays possible Traffic control (two-way signals)
Works location: Outside 63 More Lane Esher . F\W. C\W….
Works description: Connections Projects:New Supply Scheme: (Approx Depth 450mm-600mm):1x 6m Road Crossing 1x Joint Bay…
Responsibility for works: UK Power Networks
Current status: Advanced planning

________________________________________

Rushett Road, Thames Ditton, Surrey

23 January — 10 February
Delays possible Traffic control (multi-way signals)
Works location: At The Junction With Ewell Road…
Works description: Removal Of Island, Footpath Buildout, Tactile Installation And Lining…
Responsibility for works: Surrey County Council
Current status: Advanced planning

________________________________________

St Georges Avenue, Weybridge, Surrey

22 January — 22 January
Delays possible Traffic control (multi-way signals)
Works location: In Footway And Verge Junction With Brooklands Road. F\W. Verge….
Works description: Connections Small Service:New Service: (Approx Depth 450mm-600mm):Excavate Joint Bay And Trench 2m I…
Responsibility for works: UK Power Networks
Current status: Advanced planning

________________________________________
Back to the What’s in Walton Homepage

Have you joined the Walton-on-Thames Community group on Facebook?
https://www.facebook.com/groups/OurWaltonOnThamesCommunity/
________________________________________




________________________________________

Recent Articles:

________________________________________
The Do’s & Don’ts of Buying a Home
________________________________________
Save The Regent – Walton-on-Thames
________________________________________
Rydens Enterprise School Joins THPH
________________________________________
Waterside Drive Sports Hub – An Overview
________________________________________
Walton-on-Thames Property Market
________________________________________

________________________________________

Leave a Reply

Your email address will not be published. Required fields are marked *